CSW18: Raise water levels in permanent grassland peat soils to near the land surface
Department for Environment, Food & Rural Affairs · paid by Rural Payments Agency
- Dates
- No fixed application deadline
- Where
- England
What you must do to get paid for this CSHT action and advice on how to do it.
About this grant
This action is part of Countryside Stewardship Higher Tier ( CSHT ). You must read the CSHT guidance before you apply.
Duration
10 years
How much you’ll be paid
£1,381 per hectare ( ha ) per year
Action’s aim
This action’s aim is to raise the water level throughout the year on permanent grassland with lowland peat soils to between 10 and 30 centimetres (cm) below the mean field surface all year around.
The purpose is to:
reduce the degradation of lowland peat soils
reduce greenhouse gas emissions
Where you can do this action
You can do this action on eligible land that’s located below the moorland line.
You can only do this action if you have an implementation plan or feasibility study agreed with Natural England.
Land is eligible if confirmed as lowland peat in a feasibility study or implementation plan and with support from Natural England.
You cannot do this action:
where it would damage priority habitats, protected species or features of archaeological, historic or landscape value, unless you can take approved measures to mitigate this
where it may increase the risk of flooding or waterlogging outside the agreement area
where it could damage third party land or buildings, infrastructure or other assets
if there are conflicts with public access or other uses of the land that cannot be resolved
Eligible land
You can do this action on land that’s:
an eligible land type
registered with an eligible land cover on your digital maps
declared with a land use code which is compatible with the eligible land cover
Eligible land type Eligible land cover Compatible land use code
Permanent grassland Permanent grassland PG01
Available area you can enter into this action
Total or part of the available area in the land parcel.
Rotational or static action
This action is static. This means you must do it on the same location each year of the action’s duration.
What to do
Your Natural England adviser will assess your land. They’ll work with you to adapt and agree the activities you must do to achieve this action’s aim. All mandatory activities will be set out in your agreement document.
To get paid for this action, you must:
maintain water levels between 10cm and 30cm below mean field surface level, across the land entered into the action, all year round by the second year of your agreement
install dip wells within the first year of your agreement
record water levels from dip wells each month
When to do it
You must do this action each year of its duration.
Evidence to keep
You must keep evidence to show what you have done to complete this action. If it’s not clear that you have done this action in a way that could reasonably be expected to achieve its aim, the Rural Payments Agency ( RPA ) may ask for this evidence. You must supply the evidence if they ask for it.
Other actions or options you can do on the same area as this action
You can do the following actions or options on the same area in a land parcel as this action.
Some actions or options can only be done on the same area if they’re done at a different time of year to this action.
Scheme Action or option code
SFI 2024 actions CSAM1, CIGL3, BFS3, OFC1, OFC2, OFM1, OFM2, PRF2, CLIG3, HEF5, HEF6, CIPM1, CNUM1
SFI 2023 actions SAM1, IGL3, LIG1, LIG2, IPM1, NUM1
CSHT actions CGS21, CGS26, CSP13, CSP14, CSP15, CWS1, CWS3, CSP21, CSP20, CPAC1, CHS4, CHS5, CWT1
CS options GS13, GS2, GS3, GS5, HS4, HS5, OR1, OR2, OT1, OT2, SW2, WT1
ES options N/A
You can do the following actions or options on the eligible boundaries of a land parcel entered into this action:
CSHT actions: CWT3, CHRW4
SFI 2024 actions: CHRW1, CHRW2, CHRW3, BND1, BND2, WBD2
SFI 2023 actions: HRW1, HRW2, HRW3
CS option BE3 (management of hedgerows)
Consents, permissions and licensing requirements
To apply for this action, you’ll need:
to agree an implementation plan or feasibility study with your Natural England adviser – a plan or feasibility study should include a flood risk assessment (if required)
Scheduled Monument Consent from Historic England for any work on scheduled monuments
consent from Natural England for any activity on land designated as a site of special scientific interest ( SSSI )
to obtain the necessary consents and water resource licences from the Environment Agency, Lead Local Flood Authority ( LLFA ) or Internal Drainage Board ( IDB ) as appropriate before undertaking any works – for example, abstraction licence, impoundment licence or transfer licence from the Environment Agency
You may need to:
get advice from your Natural England adviser if you have other archaeological or historic features on your agreement land
get planning consent or permission to divert a public right of way from your local planning authority, if your agreement requires building or removing a flood defence bank
get a wildlife licence from Natural England if your activities affect a protected species or their habitat
All archaeological and historic features (including scheduled monuments) are identified in your Historic Environment Farm Environment Record ( HEFER ).
If you’re a tenant, it’s your responsibility to check whether your tenancy agreement allows you to complete what’s required in the actions you choose. You may need your landlord’s consent.
Capital grants to support this action
If you need to complete an implementation plan or a feasibility study before you apply, you can apply for capital grants plans funding .
You can also apply for capital items to help you achieve the action’s aims. Your Natural England adviser will discuss eligible capital items with you.
Advice to help you do this action
The following optional advice may help you to do this action. Your agreement document will set out all the activities you must do.
Manage water levels
Managing water levels are complex and management will vary from site to site. Manage water levels depending on the characteristics of your site, particularly its:
geology
soil type and permeability
hydrology
You will agree with your Natural England adviser on what management activities you will undertake using this action and how you will manage and monitor them.
Your feasibility study or implementation plan will not set out the agricultural activity on the land, but do consider this as part of planning.
Your feasibility study or implementation plan will include your site’s:
peat depth and condition – use Natural England’s geographic data to find peaty soils in England
local geology, soil type and hydrology
the position and number of dip wells
effects on other habitats and local ecology, including any priority habitats or species, ditches of high environmental value, or historic or archaeological features
existing drainage channels relevant to the project area or those that may affect the ability to perform this action
water management and which organisations are likely to be affected and need to be consulted during the project
effects on the surrounding land use and water requirements, including getting agreement from neighbouring landowners if they will be affected
risk assessment on flooding outside the site
contingency for severe weather events, such as drought or flooding
Your feasibility study or implementation plan will also consider:
how much water is required to raise and maintain the water levels
how you’ll maintain water levels across the whole site and if you need capital works to achieve this
if you’ll need additional water
where it will be sourced from and stored
For sites of special scientific interest ( SSSIs ), you may need to ask a hydrology specialist to produce a water level implementation plan to balance and integrate the water level requirements on the SSSI . LIDAR data can help you understand the terrain of your site. You can download the data for free from the Defra data services platform
How this action may affect farming practices
Wetter conditions will affect grassland and could:
reduce yields if crops are particularly intolerant to waterlogged roots
cause access difficulties from machinery and damage to the site
limit inputs of nutrients – you may need to review how you input nutrients effectively
constrain stocking density and choice of livestock
reduce forage production
How to modify farming practices
You are likely to need to modify your farming practices in wetter conditions, you could:
invest in machinery with low ground pressure
adopt novel technologies such as using drones for checking crops and seeding
alter stocking densities, livestock types or breeds – switch to smaller and lighter breeds
adjust the timing and numbers of grazing animals
reduce or stop cuts of forage
Read about research into wetter farming and paludiculture initiatives for more information.
Responding to climate change
Read Natural England’s publication: ‘Adaptation for habitats in Environmental Land Management Schemes’ to help you consider your general response to climate change. You must continue to follow the mandatory activities for this HT action.
Eligibility
Eligibility shown as published by the source. Treat it as a guide and confirm the details on the official page before applying.
Eligible land
You can do this action on land that’s:
an eligible land type
registered with an eligible land cover on your digital maps
declared with a land use code which is compatible with the eligible land cover
Eligible land type Eligible land cover Compatible land use code
Permanent grassland Permanent grassland PG01
Relevant land types
- Grassland